Overview
- Updated On:
- March 27, 2024
- 3 Bedrooms
- 2 Bathrooms
- 113.00 m2
Description
14405
The development occupies two three-storey buildings and detached house, with the two buildings on either side of a quiet road in a residential area in the heart of Limassol. The attractive architecture makes the most of the properties’ orientation and maximizes the privacy of each apartment.
Block A houses a total of eleven apartments: four 1-bedroom apartments and seven 2-bedroom apartments. Every unit is marked by its generous spaces and home comfort, and all enjoy the privilege of a common roof garden for quiet relaxation.
The building’s location combines the best of all worlds: Although it is only a few minutes’ drive from the city centre with immediate access to the highway network leading to all the island’s main cities, the quiet surroundings create a relaxing suburban atmosphere. The development also offers the residents the convenience of being close to a shopping centre, a local school, ship management offices and other major companies. Limassol Marina and the main commercial port of Limassol as well as the city’s popular mall and the upcoming casino resort – City of Dreams Mediterranean – is only a few minutes’ drive away.
This added-value prime location will appeal to long-term residents, whether local or expatriates, who will benefit from the proximity to everyday amenities and the highway.
DISTANCES
Airport: 48 km
Restaurants: 2.5 km
Beach: 3.5 km
Medical Care: 3 km
Casino: 4.5 km
Port: 3.8 km
OVERVIEW
- 3-storey building with eleven apartments
- Four 1-bedroom apartments
- Seven 2-bedroom apartments (master bedroom with ensuite bathroom)
- Spacious open-plan kitchen, living room and dining area
- Large verandas
- Private car park
- Private storage rooms on the ground floor
- Common roof garden
SPECIAL FEATURES
- Built-in wardrobes
- Fitted kitchen
- Quality ceramic floor tiles
- Water pressure system
- Solar heating system for hot water
- Main entrance with intercom system
Internal area: 113 m2
Price subject to VAT
Construction starts 06/2023 and delivery after 18-20 months.
A+
A
B
C
D
E
F
G
H
- Principal and Interest
- Property Tax
- HOO fees