Limassol Property 2 Bedroom Apartments in Exquisite Project – West Tower

€2,350,000
Neapolis, Limassol

Overview

  • Updated On:
  • March 2, 2026
  • 2 Bedrooms
  • 2 Bathrooms
  • Covered Garages
  • 177.00 m2

Description

14980

This project is marvellous living in every sense, a trio of landmark beachfront buildings: East Tower, West Tower & North Residences building situated right at the Limassol’s affluent sea front.

This is a place to live, work and enjoy, long after the sun dips beyond the sea’s horizon. It is as much an experience as it is a destination, somewhere and something that gathers people together to share everything that’s great about life on sun-kissed shore. Brought to life by a world-class collaboration of architects, designers and developers,  is also a unique opportunity to begin an exciting new chapter of living a dream.

PROJECT FEATURES

Project’s distinct social areas offer resident-only facilities for secluded leisure and relaxation, as well as a lively, bustling, public space that can be enjoyed and experienced by everyone.

  • Members’ pool, bar, gym, spa, garden
  • Kid’s play area
  • Resident-only indoor pool
  • Fitness suite and informal relaxation areas
  • Restaurants, bars and shops for all

WEST TOWER

2 bedroom apartment:

Floor: 31

Internal area:: 112 m2

Covered veranda: 62 m2

Uncovered veranda: 3 m2

Energy Class: A
A+
Energy class A
A
B
C
D
E
F
G
H

Address: Neapolis
City:
Zip: 3106
Country: Cyprus

Listing Id: 14980
Price: €2,350,000
Property Size: 177.00 m2
Bedrooms: 2
Bathrooms: 2
Year Built: 2023
Garages: Covered
Available from: 2023-12-01
Property ID: 14980

Other Features
Air conditioning
Common Pool
Complex with Facilities
Double glazed thermal aluminium windows
Garden
Gym
High-quality kitchen cabinets
High-quality wardrobes
Lift
Marble Floors
Parking space
Sauna
Security alarm system
Spa
VRV Systems

Project Plan
Floors: 20-24
Floors: 29-32

Contact Me

Similar Listings

10
Sold
Resale

Limassol Property Beachfront Two Bedroom Apa...

€1,390,000
19336 This exquisite 2-bedroom apartment, located in the prestigious Beachfront area of Ag ...
22 Covered 99.00 m2
7
Sold
New property

Limassol Property Brand-New Two Bedroom Pent...

€876,000
19258 This modern project is located in the heart of Germasogeia, Limassol, just 450 m fro ...
22 Covered 186.00 m2
4
Sold
New property

Limassol Property Modern Two Bedroom Apartme...

€343,000
19148 This modern project is located in Agios Athanasios, Limassol, close to shops, bakeri ...
22 Covered 108.00 m2
4
Sold
New property

Limassol Property Modern One Bedroom Apartme...

€241,000
19147 This modern project is located in Agios Athanasios, Limassol, close to shops, bakeri ...
11 Covered 63.00 m2
  • Advanced Search

  • Tools

    Property Fees Calculator

    VAT Frequently Asked Questions

    Capital Tax Calculator

  • Mortgage Calculator

Compare Listings

Allison Efstathiou
Call: +357 25313135